BOLLETTINO N. 75

Polymer-duct systems for internal bonded post-tensioning

 

Contents

1   Introduction, scope of report

2   Terms, definitions and abbreviations

3   General and design/detailing considerations

4   Considerations for installation and use on site

5   Material requirements

6   Component requirements

7   System requirements

8   Approval

9   Evaluation of conformity

10 References and standards

Annex A Component assessment procedures

Annex B System assessment procedures

Annex C Summary of requirements, methods of verification and acceptance criteria for polymer-duct systems – Recommended specification